Dimension | Centralised FM Model | Localised FM Model |
Emergency response time | 1–3 days: central contractor travels to location | Same-day: local tradesperson already in the area |
Local regulation knowledge | Generic; may miss regional building codes or permit requirements | Familiar with local authority requirements and inspection bodies |
Contractor travel cost | High: included in rate or billed separately for distant locations | Minimal: contractor within the same city or district |
Relationship with local suppliers | None: parts sourced centrally or at unknown local cost | Established: faster parts procurement, better pricing |
Community and tenant relations | Impersonal; contractors unfamiliar with building or occupants | Known face; faster access, less friction with on-site staff |
Scalability across regions | Consistent but slow: same contractor, longer lead times everywhere | Fast everywhere: local capacity in each region independently |
Compliance documentation | Centralised but delayed: paperwork follows days after job | On-site completion: documentation generated at the location |