# | FM Mistake | Typical Financial Impact |
1 | No written maintenance schedule | €3,000–15,000/year in avoidable emergency repairs per location |
2 | Single-contractor dependency | 20–40% downtime increase when contractor is unavailable; emergency rate premium up to 60% |
3 | Missing compliance documentation | Fines up to €50,000; potential insurance voidance; mandatory re-inspection costs |
4 | Deferred minor repairs | Average 8–10x cost multiplier when small defects become structural failures |
5 | No central asset register | 15–25% budget waste on duplicate or unnecessary service calls across locations |
6 | Reactive-only approach to HVAC | Energy overconsumption of 20–35%; shortened equipment lifespan by 3–5 years |
7 | Inconsistent contractor vetting | Rework costs averaging 30% of original job value; liability exposure on faulty work |
8 | Manual work order management | 3–5 hours of administrative overhead per location per week; missed SLA deadlines |
9 | No response-time SLAs in contracts | Uncontrolled downtime duration; no basis for cost recovery from contractors |
10 | Treating all locations identically | Over-servicing low-risk sites, under-servicing high-traffic ones — net budget waste of 10–20% |