Equipment / System Type | Typical Testing Interval |
Fixed electrical installations (distribution boards, wiring) | Every 4 years |
Portable equipment used in offices | Every 1–2 years |
Portable equipment on construction sites / in workshops | Every 3–12 months |
Machinery and fixed equipment in production | Annually |
Protective devices (e.g. residual current devices) | Every 6–12 months |
Extension leads, mobile distribution units | Every 3–6 months |
Aspect | Site-by-site (separate provider per location) | Centralised (one partner for all locations) |
Scheduling | Handled individually per site, often manually | One testing schedule across the network |
Cost visibility | Visible per site only | Consolidated overview across all locations |
Documentation | Spread across local folders | Stored centrally and easy to find |
Deadline tracking | Risk of missed dates | Automated reminders before dates are due |
Testing quality | Depends on the local provider | Consistent standard across the network |