German building energy law requires operators to maintain components that materially affect the efficiency of heating, cooling and ventilation systems regularly and with appropriate expertise (§ 60). It does not set one annual service interval for every heat pump. The manufacturer’s instructions, operating hours, site conditions and service contract determine the routine schedule. An annual professional appointment is often a practical planning rhythm, with operational readings and alarm checks between visits. A heavily used reversible system or exposed outdoor unit may need more frequent attention.
A separate statutory operating inspection may apply under § 60a. It concerns heating heat pumps installed after 31 December 2023 in buildings with at least six apartments or other independent units, or feeding a building network serving at least six such units. The first inspection is after a full heating season and at the latest two years after commissioning. For systems without remote monitoring, repeat it no later than every five years. Hot-water-only and air-to-air heat pumps are excluded from this specific inspection rule. If the provision applies, the inspection covers controls, hydraulic balance, measured seasonal performance and further technical checks; required optimisation measures are to be completed within one year.
Task | Timing and basis |
Routine service | Regularly under § 60; use the manufacturer’s schedule, duty cycle and site risk to set visits. |
§ 60a operating inspection, where applicable | After one complete heating season, at most two years from commissioning; repeat at most every five years if there is no remote monitoring. |
F-gas leak check, where applicable | Separate interval under Regulation (EU) 2024/573 depends on refrigerant type, charge and CO₂-equivalent or mass threshold. |
Performance monitoring | Read electricity, heat output, temperatures and alarms at regular operating intervals. |
The EU F-gas rules are another distinct layer. A refrigerant circuit containing covered fluorinated gases can require leak checks and records depending on its charge. A natural-refrigerant unit is assessed differently under those specific F-gas rules. Refrigerant work must be assigned to appropriately qualified personnel; the refrigerant label and equipment documentation should be checked before putting a date on the calendar.